Implementation planning, including safety planning, building and supervision for the expansion of the incineration facility of Poggibonsi by building of a new third line with optimization and systems guidance up to delivery. The third line essentially consists of grate firing, a heat recovery boiler, cloth filter and nitrogen reduction through DENOX, steam water loop, a steam turbine and air capacitor.
Capacity: 56.000 t/year