WWTP Wipptal

Sterzing/South Tyrol

Construction of the anaerobic sewage treatment plant, its biogas lines with energy recovery through biogas motors, grit chamber/grease trap system, simultaneous phosphate precipitation with metering system, de-nitrification and activated sludge tank equipment, anaerobic sludge treatment and combined heat and power unit using biogas motors.

Hard Facts

Capacity: 30.000 EW

Download PDF