Biomass fired cogeneration plant and district heating net Stern

Stern/South Tyrol

Expansion of the DH station of the district heating plant in La Villa. Expansion of the pre-existing DH station with a rape oil operated heating boiler and a capacity of 16.000 kW.
a) Thermo-hydraulic Equipment:
Delivery and installation of a oil tank system including equipment (actual power output 3.000 kW/h), tank pipes, pump station, water treatment system, thermo oil system (output 150 kW), as well as the heat measurement.
b) District heating grid:
Ready-for-use delivery, implementing including excavation over the total length 35.000 m.

Hard Facts

Pipe system: ABB-MÖLLER
Electric power: 7.000 kW/h
Heat recovery: VAS condensation
Capacity: 800 kW
Heating grid: 35.608 lfm