Biomass fired cogeneration plant and district heating net Primiero

Primiero/Trentino

Realization of a biomass district heating system in the municipality  Transacqua.
The work includes excavation as well as the attendant facilities (output 4.000 kW), connection to the heating kettle and water treatment plant.
Delivery and implementing of the outstation. The work includes civil buildings, galleries, as well as attached facilities and implementation of 617 outstations.
Realization of the district heating system. The work includes excavation. The district heating system has a total length of 35.000 m and DN 25 to DN 250 pipes.
District heating station Fiera di Primiero – 2nd contract section.
Delivery, relocation and implementing of the pipes for the realization of the district heating station – 2nd contract section. Bore of DN 25 to DN 250 over a total length of 6.200 m pipes, including excavation and the delivery of the alarm system.

Hard Facts

Electric capacity: 1.000 kWe
Thermal capacity: 20.000 kWth
Substations: from 15 to 1.000 kW
Pipe system: ZPUM / Ecoline
Alarm system: Nordic