WWTP Brixen - Expansion

Brixen/South Tirol

Expansion of the Municipality of Bressanone’s wastewater treatment plant. Construction of a third purification line and upgrading of the two existing lines with phosphate precipitation, simultaneous de-nitrification and nitrification systems. Expansion of the sludge handling and sedimentation racks.

Hard Facts

Potentiality: 60.000 P.E.
Capacity: 16.000 m3/d

Download PDF