“It’s a classic outdoor swimming pool renovation,” explains Andreas Eschgfeller, the project manager in charge at ATZWANGER. The pools – the swimmers’ and non-swimmers’ pools, as well as a children’s pool with a spray park – have already been renewed. The multi-purpose pool covers an impressive 1,000 square metres. Now it was the turn of the pool water treatment plant to ensure unadulterated, modern swimming fun for everyone.
“Multi-layer filters for water treatment, heat recovery and energy-efficient pumps are standard for us,” explains the expert with satisfaction. “And, of course, everything has to be ready in time for the start of the season.”
The highly competent ATZWANGER team managed this with ease; at peak times, there were up to six team members on site.
And in the autumn, the indoor swimming pool will be added as well …